Gaylord Opryland
Title V Permit
Nashville, TN


  • Application for a part 70 Title V Operating Permit. Emission sources include two (2) 2,200 kW reciprocating engine driven generators, three (3) natural gas/fuel oil fired boilers totaling 25 MMBtu/hr, twenty-three (23) natural gas/fuel oil fired boilers totaling 25 MMBtu/hr, two (2) 20,000 fuel oil storage tanks, four (4) paint spray booths, twelve (12) reciprocating engine driven generators, two (2) perchloroethylene dry cleaning machines, one (1) gasoline refueling tank, multiple gas fired roof top units, and a cogeneration facility with one (1) 5 MW gas turbine generator, one (1) 99 MMBtu/hr duct burner, and one (1) 99 MMBtu/hr package boiler.

  • Application for a Permit to Construct for two diesel engine fired generators rated at 8,836 KW each for Opryland Hotel and Convention Center. RACT was required to evaluate further NOX control for the source.