University of Alabama at Birmingham
Replacement of Chiller CH74-1
Birmingham, AL

The University of Alabama at Birmingham has an ongoing program to replace aging equipment in their existing Chilled Water Plant No. 1. This project was designed to replace an existing 4,000-ton chiller and all related support equipment. The existing 4,000-ton chiller was replaced with two 2,000-ton chillers. Also included in this replacement was five cooling tower cells, two condenser water pumps, two primary chilled water pumps, new compressed air equipment and piping, new chilled water piping and modifications, a new instrumentation and control system, and new electrical equipment additions and modifications.