Page Header

Markets

Increase Font Size Decrease Font Size ShareThis

Nashville International Airport

Hangar Development, MRO Facility

Nashville, TN

New schedule one Hangar is 90,000 SF with office/shop support space. Work consists of HVAC for hangar using radiant heat; exhaust hoods for shops; space conditioning, plumbing for domestic cold/hot water; air compressor and natural gas piping. Electrical design was required for LED lights, shops, and parking lot lighting.

With more than 75 maintenance professionals at BNA, SkyWest services up to 10 aircraft every night at the new facility.

The project was delivered by Messer with design support services provided by Garver Engineering, Inc., AECOM, Logan Patri, ICT, KS Ware and LI Smith.

Size

90,000 SF

Owner

Metro Nashville Airport Authority

Client

Garver USA

Awards

Completion

05/2017

Category

Aviation