


Jackson-Evers International Airport
Boiler Plant
Pearl, MS
As the Prime Consultant for the project, ICT's services included a detailed evaluation of the existing boiler plant to develop an extensive phasing plan, designing a new system to replace the existing steam boiler and HVAC hot water heat exchangers with high-efficiency condensing boilers with variable flow pumping, designing an interim backup system to be used during construction, and providing boiler plant commissioning.
Size
Owner
Jackson Municipal Airport Authority
Client
Jackson Municipal Airport Authority
Awards
Completion
2013
Category
Aviation