


P465 Aircraft Maintenance Hangar
Marine Corps Air Station
Beaufort, SC
ICT provided mechanical, electrical, plumbing, and information technology design for a new 55,000 SF hangar with two-story administrative space and 95,000 SF three-story parking garage. The project included the installation of a new taxiway system for access to a new F35 hangar. Electrical design included field survey of existing runway/taxiway lighting systems and expansion of the existing systems with new LED edge lighting, and 5kV lighting circuiting with associated controls.
Size
55,000 SF
Owner
NAVFAC
Client
STOA Architects
Awards
Completion
07/2017
Category
Aviation / Government