Consolidated Communications Facility

Two-Story Office Building

MacDill Air Force Base, FL

The new two-story, 29,684 SF Consolidated Communications Facility is set in a campus environment and includes a Sensitive Compartmented Information Facility (SCIF). The project includes the 6,366 SF renovation of the existing Building 18 to house Airmen Family Readiness Center (AFRC) personnel and the 7,403 GSF renovation of Building 260.

  • UPS systems
  • Computer access flooring
  • Environmental controls
  • Sensitive Compartmented Information Facilities (SCIF)
  • Site improvements
  • Complies with DoD force protection requirements per unified facilities criteria (UFC)

The Consolidated Communications Facility complies with DoD force protection requirements per Unified Facilities Criteria.

Sustainability:

  • The building automation system (BAS) was integrated with the existing campus energy management control system.
  • The facility design includes a 10,000 SF raised floor area located on the second level to withstand local hurricane conditions.
  • Emergency power provisions include a 1750 kW emergency generator with 72 hours of fuel capacity and two separate 500 kVA redundant UPS units.

Project Highlights:

  • The Consolidated Communications Facility complies with DoD force protection requirements per Unified Facilities Criteria.

Size

43,453 SF

Owner

US Air Force; USACE Mobile District

Client

STOA Architects

Awards

Completion

Category

Federal / Data Center