P-163 Marine Air Support Squadron Complex
Cherry Point, NC
The Squadron Complex consisted of four new buildings, Headquarters building, Maintenance building, Supply building, and Hazmat building. ICT provided mechanical, electrical, plumbing, and communications design. Buildings were conditioned by a variable refrigerant flow system. A new building automation system (BAS) including design, sequence scheduling, and graphics was included. The new BAS design consisted of energy management control system integration with the VRF system as well as all the HVAC equipment. Mechanical utilities include heating, ventilation, and air conditioning, water lines, plumbing, and plumbing fixtures, sanitary sewer lines, fire protection systems, and supply lines.
Electrical systems include power, lighting, and fire alarm. Built-in equipment includes one passenger/freight elevator, fire pump with generator backup, security vault, backup generator for the Headquarters building, Protective Distribution System, vehicle lifts, and other vehicle maintenance/electrical/communications support equipment. Electrical utilities include primary and secondary distribution systems, lighting, transformers, and telecommunications infrastructure.
Sustainability:
- LEED NC Silver
- Building Automation System
- Commissioning
Project Highlights:
- The new BAS design consisted of energy management control system integration with the VRF system as well as all the HVAC equipment.
Size
78,100 SF
Owner
NAVFAC Washington
Client
Mitchell Industrial Contractors and Brasfield & Gorrie LLC
Awards
LEED® Silver
Completion
07/2016
Category
Military