Increase Font Size Decrease Font Size ShareThis

North Alabama Medical Center

Replacement Facility

Florence, AL

The $230 million North Alabama Medical Center includes 823 miles of electrical cable and 11,000 cubic yards of concrete. The 280 bed, 6-floor medical center has been designed from the ground up making future patients top priority. Construction took approximately 2 ½ years to complete.

The medical center was designed to include two additional tower patient floors plus five additional floors and first-floor horizontal expansion. The infrastructure was sized for these future loads with the powerhouse designed for modular expansion for future equipment.

Sustainability

  • Energy Star score of 95.
  • More energy efficient than 95% of similar properties nationwide.
  • Controllability of lighting and thermal comfort.
  • High-efficiency magnetic levitating bearing refrigerant machines.
  • Heat recovery chillers for the surgical suite.
  • Dual-fuel high-efficiency condensing boilers.

Make sure to check out the virtual tour!

Size

480,000 SF

Owner

RCCH Healthcare Partners

Client

Gould Turner Group

Awards

Completion

11/2018

Category

New Hospital / CUP