Increase Font Size Decrease Font Size ShareThis

Isaac Litton Middle School

Renovation

Nashville, TN

ICT provided mechanical, electrical, plumbing and fire protection design, and construction administration for a 76,600 SF renovation to an existing school.  An energy model for LEED was performed. The school features:

  • Classrooms
  • Library
  • Assembly Area
  • Gymnasium/Playroom
  • Cafeteria

Sustainability:

  • LEED Silver certification.
  • 30% energy savings above ASHRAE 90.1.

Size

76,600 SF

Owner

Metro Nashville Public Schools

Client

Bauer Askew Architecture

Awards

LEED® NC Silver

Completion

Category

K-12 Education