Increase Font Size Decrease Font Size ShareThis

Twin Creeks Technologies

Solar Manufacturing Plant, Phase 1

Senatobia, MS

This project involved the construction of an 88,000 SF manufacturing facility and a 12,000 SF office building. ICT provided electrical design for Phase I of this multi-phase project. The new facility provides space to serve administrative, operations, research and manufacturing activities and will be the site of a solar panel array. ICT is also designing a grid connected solar array on this site. The plant is 250,000 SF at an estimated construction cost of $175,000,000. At full capacity, the plant will produce 100 megawatts of solar panels annually.

Sustainability:

  • Solar Panel Array
  • The first renewable solar technology production plant in Mississippi.

Project Highlights:

  • Administrative Spaces (20,000 SF)
  • Manufacturing (65,000 SF)
  • Emergency Generator for Life Safety Requirements
  • 4 – 3000 kva transformers provided at 480/277 and 400/231 volts for equipment specific requirements.
  • 250 kw grid connected solar array.

Size

Owner

Twin Creeks Technologies, Inc.

Client

Edwards Electric, LLC

Awards

Completion

Category

Manufacturing